In the event that the actual locations of any facilities deviate in any material respect
from the locations identified in the plans, drawings and specifications submitted
with the permit application, the permittee shall immediately notify the Village Engineer
of such deviation and, additionally, shall submit a revised set of drawings or plans
to the village within 90 days after the completion of the permitted work. The revised
drawings or plans shall specifically identify where the locations of the actual facilities
deviate from the locations approved in the permit. If any deviation from the permit
also deviates from the requirements of this article, it shall be treated as a request
for variance in accordance with section 20-223. If the village denies the request for a variance, then the permittee shall either
remove the facility from the right-of-way or modify the facility so that it conforms
to the permit and submit revised drawings or plans therefor.