The utility shall remove all excess material and restore all turf and terrain and
other property within ten days after any portion of the rights-of-way are disturbed,
damaged or destroyed due to construction or maintenance by the utility, all to the
satisfaction of the village. This includes restoration of entrances and side roads.
Restoration of roadway surfaces shall be made using materials and methods approved
by the Village Engineer. Such cleanup and repair may be required to consist of backfilling,
regrading, reseeding, resodding, or any other requirement to restore the right-of-way
to a condition substantially equivalent to that which existed prior to the commencement
of the project. The time period provided in this section may be extended by the Village
Engineer for good cause shown.