Wilmette |
Code of Ordinances |
Chapter 8. HOUSING AND BUILDING REGULATIONS |
Article XIII. ELECTRICAL CODE |
§ 8-480. Inspection and permit fees.
The schedule of fees for electrical permits and inspections shall be as follows:
(1)
For the issuance of an electrical permit: $45.00.
(2)
Plus service installations of:
a.
100 amp: $34.00.
b.
200 amp: $45.00.
c.
400 amp: $62.00.
d.
Per hundred amp over 400 amps add $ 45.00.
(3)
Plus.
a.
For each ceiling outlet, side outlet, switch or receptacle, an additional $1.15.
b.
For each air conditioner condenser unit, an additional $39.00.
(4)
For each required scheduled inspection, or any reinspection deemed necessary as a result of work not performed in accordance with approved plans and/or code compliance: $39.00.
(5)
Elevator permit fees.
a.
Plan examination: $135.00.
b.
For all construction of elevators, escalators dumbwaiters, dock lifts, wheelchair lifts, and the like: $20.16 per $1,000.00 valuation.
c.
For each required scheduled inspection, or any reinspection deemed necessary as a result of work not performed in accordance with approved plans and/or code compliance: $79.00.
(Code 1993, § 9-5.3; Ord. No. 71-O-32, 12-7-1971; Ord. No. 83-O-33, 7-5-1983; Ord. No. 91-O-37, 5-21-1991; Ord. No. 2002-O-100, 12-10-2002; Ord. No. 2003-O-89, 11-24-2003; Ord. No. 2004-O-104, 11-22-2004; Ord. No. 2005-O-104, 11-21-2005; Ord. No. 2006-0-94, 11-28-2006; Ord. No. 2007-O-87, 11-27-2007; Ord. No. 2008-O-88, 12-9-2008; Ord. No. 2009-O-72, 11-24-2009; Ord. No. 2010-O-71, 11-23-2010; Ord. No. 2011-O-74, 11-22-2011; Ord. No. 2012-O-63, 11-27-2012; Ord. No. 2013-O-71, 11-26-2013)