§ 26-258. Installation requirements.  


Latest version.
  • (a)

    All excavations in the public right-of-way for building sewer installation shall be adequately guarded with lighted barricades. Streets, sidewalks, parkways, and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the Village Engineer.

    (b)

    Whenever any length of the public sewer or building sewer becomes broken or cracked during construction of a building, such defective length shall be entirely replaced at no cost to the village. No patching of such break will be accepted.

    (c)

    All building sewers shall be maintained at the cost of the owner of the premises to be served thereby. All such installations shall be under the supervision of the Director of Community Development.

(Code 1993, § 18-7.20; Ord. No. 98-O-38, 5-26-1998)